5/12/2009Effective July 1, 2009 the state fee assessed on building permits will increase from 1.75% to 2%.
11/21/2008EFFECTIVE JANUARY 1, 2009, BUILDING INSPECTOR TRAINING WILL NO LONGER BE ON THE THIRD WEDNESDAY OF EVERY MONTH, INSTEAD IT WILL BE THE FOURTH WEDNESDAY OF EVERY MONTH
10/11/2007PIER FOUNDATIONS UNDER ON-FRAME MODULAR HOMES Piers supporting on-frame MODULAR homes shall be fully parged, or filled solid using type M or type S mortar. This is a requirement of the manufacturer and is applicable under the USBC section 102.3(5)
BONDING REQUIREMENTS FOR CSST TUBING
A single bond shall be made at or near the service entrance of the structure or the gas meter of each individual dwelling. The bonding conductor shall be 6 AWG copper wire. The corrugated stainless steel tubing portion of the gas piping system shall not be used as the point of attachment of the bonding conductor at any location along its length under any circumstances.